Description
Compound:
Module «Autotransformer»
Module «Measuring module»
Wattmeter module
Module “Stopwatch. Load»
Set of electrical installation products and electrical devices
Set of tools
Set of wires
Tip set
Set of clips and screws
AC asynchronous motor with connection panel
Electric motor fault simulator
Multimeter
Mounting panel
Frame with two-level frame
Set of connecting conductors and cables
Guidelines
Technical description
Visual instructions «MNECA-AR» with elements of augmented reality on a Flash drive
Visual instructions “MNETSA-AR for VR glasses” with elements of augmented reality on a Flash drive
Overall dimensions 862x265x875 mm (LxWxH); weight no more than 50 kg.
List of laboratory works and experiments
1. Study the rules for installing electrical wiring.
2. Study of various connection diagrams for electric lighting devices.
3. Study of lighting network protection.
4. Checking voltage transformers.
5. Study of the connection circuit for a single-phase active energy meter.
6. Checking a single-phase active energy meter.
7. Increasing the power factor of electrical equipment using capacitors.
8. Study of the operation of a residual current device (RCD).
9. Study of AC contactors.
10. Study of the capacitor starting circuit of a three-phase asynchronous AC electric motor.
11. Study of the circuit of an irreversible magnetic starter.
12. Study of the reversible magnetic starter circuit.
13. Thermal protection of an asynchronous AC motor.
14. Methods for troubleshooting three-phase asynchronous AC motors.
